Written, itemized quotes across Toronto - no obligation
Converted industrial stock Slab levelling standard Acoustic compliance Levelling $2 – $4 / sq ft

Flooring in Liberty Village

Liberty Village was built as factory floor before it was living space. Ontario Flooring Contractors treats those slabs as the industrial concrete they are. Factory-era slabs here usually need levelling at $2 to $4 per square foot before engineered hardwood ($8 to $15) or vinyl plank ($5 to $9) goes over them.

Industrial slabs levelled and primed first
Moisture tested before any glue-down
Acoustic underlay to your building's number
Hard-wearing finishes for open-plan units

Get a quote in Liberty Village

Tell us the room, the floor you want and roughly the size.

What can we help with?

So the right crew reviews your project.

No obligation. Any workmanship warranty is set out in your written quote, job by job.

Hardwood installation

Recent Project in Liberty Village

Dark-stained hardwood being laid over underlayment across an open main floor in Liberty Village, with the rows worked around a double-sided fireplace in the middle of the room.

Request a quote

Liberty Village slabs were poured for factory floor

Industrial concrete was poured to carry load and to drain, not to sit flat for flooring. It commonly has a fall built into it, patches where machinery was bolted down, and surface hardeners that affect how adhesives and primers bond. None of that is a problem once it is known. All of it is a problem when a click floor is laid straight onto it and the joints start separating over the low spots within a year. On a Liberty Village unit we expect to quote levelling and a primer matched to the slab surface, and we check for old surface treatments before choosing an adhesive.

Floors we install in Liberty Village

Loft conversions

Levelling and priming, then engineered, plank or tile over industrial concrete.

Newer infill condos

Flat but young slabs, tested for cure before a glue-down floor goes on.

Live-work and studio units

Hard-wearing surfaces and coated concrete where the space takes real use.

What we look for in a Liberty Village property

Fall built into the slab

Industrial floors were often poured to drain. That is a slope, not a dip, and it needs a different levelling approach.

Old surface hardeners and sealers

These affect adhesive bond and have to be ground off or primed over, which is a separate line.

Machine bolt patches and repairs

Patched areas cure and behave differently to the surrounding slab, and they telegraph through a thin floor.

The declaration's acoustic number

A converted building still has a unit below yours, and the declaration still governs.

Liberty Village industrial slabs hide their history

A slab poured for machinery has been patched, drilled, bolted into and sealed over more times than any record shows. Those patches cure differently to the surrounding concrete and they telegraph through a thin floor within a year. Surface hardeners applied decades ago still affect how an adhesive bonds today. We grind a test patch and check what comes off before committing to an adhesive system, because the slab in one unit here tells you very little about the one next door.

What our clients say

Reviews collected directly from clients.

5/5

We chose Ontario Flooring for luxury vinyl plank installation in our basement. They prepared the subfloor properly, explained the process clearly, and delivered an even, durable finish.

Jennifer M.

Client direct

5/5

The team refinished our existing hardwood floors and brought them back to life. The colour looks great, and the final finish is smooth and consistent.

Daniel R.

Client direct

Questions about flooring in Liberty Village

Why is levelling always on the quote here?

Because the concrete was poured for a factory. A tolerance that was perfectly good for machinery is well outside the 3/16 of an inch over 10 feet that a floating floor needs. We measure it rather than assume it, but in this neighbourhood it is usually needed.

Can I polish the existing concrete instead of covering it?

Sometimes, and it suits a loft. It depends on the slab's condition, what was spilled on it over decades of industrial use, and how much patching is visible. A coating at $7 to $14 per square foot is the more predictable version of the same idea.

Does a converted building have the same acoustic rules as a new tower?

Yes, and sometimes stricter ones. Older slabs transmit impact noise more readily, so a converted building's declaration may set a higher IIC minimum than a new-build next door.

Price your Liberty Village flooring job

One visit covers the measurement, the readings and the written quote.

Back to top