Written, itemized quotes across Toronto - no obligation
Detached and semis Wood joist floors Subfloor checked Hardwood $10 – $18 / sq ft

Flooring in York

York is houses rather than towers, which means joists and a subfloor that has to be measured. Ontario Flooring Contractors checks it before pricing a hardwood floor. New solid hardwood runs $10 to $18 per square foot installed, plus $2 to $3 for a plywood overlay where the subfloor falls short; a main floor takes two to four days.

Subfloor thickness checked against the 19 mm minimum
Squeaks fixed before the new floor goes down
Plywood overlays where the panel is too thin
Hardwood, engineered, plank, laminate and tile

Get a quote in York

Tell us the room, the floor you want and roughly the size.

What can we help with?

So the right crew reviews your project.

No obligation. Any workmanship warranty is set out in your written quote, job by job.

In York the subfloor is the whole conversation

Everything here sits on wood joists with a panel or plank subfloor, which opens up options a downtown condo does not have: solid hardwood can actually be nailed down, and there is no declaration setting an acoustic minimum. What replaces those constraints is the subfloor itself. We want a 19 mm panel under nail-down hardwood over joists at 16 inch centres, and a good deal of the older stock in this part of the city was built with less, or with plank rather than sheet. Where the reading comes up short, a plywood overlay at $2 to $3 per square foot goes down first. It is also the moment to fix squeaks, because a loose panel refastened now is silent for another thirty years.

Floors we install in York

Solid hardwood installation

Nailed down over a 19 mm subfloor, or an overlay first.

Subfloor overlays and repairs

Plywood added and squeaks refastened before anything finished goes on.

Whole-house floor replacement

Multiple rooms and a staircase kept consistent through one continuous scope.

What we look for in a York property

Panel thickness against 19 mm

Below it, an overlay is required before nail-down hardwood.

Whether the floor squeaks now

It is far cheaper to refasten the subfloor while it is exposed than to chase a squeak through a finished floor.

Joist spacing and span

Wider spacing or a long span means more deflection, which matters most under tile.

Whether the floors connect

Running one floor through a whole level looks better and avoids transitions, but it needs the levels to actually match.

Doing a whole York house at once

Running one floor through a whole level looks better than a room-by-room patchwork and it usually costs less per square foot, because setup, delivery and disposal are shared across the job. The catch is that you need somewhere else to be while it happens. Splitting it into two phases doubles the mobilisation and creates a join that has to be planned. The quote shows both so the difference is a decision rather than an assumption.

What our clients say

Reviews collected directly from clients.

5/5

Ontario Flooring installed new hardwood flooring throughout our home, and the results look beautiful. The crew was careful, professional, and kept the work area clean from start to finish.

Michael C.

Client direct

5/5

Ontario Flooring replaced old carpet in our bedrooms with new flooring. They worked efficiently, helped us understand the options, and completed the installation on schedule.

Amanda S.

Client direct

Questions about flooring in York

Can I have solid hardwood here?

Yes, and this is where it belongs. You have joists and a wood subfloor, which is exactly what nail-down hardwood is designed for. The only question is whether the existing subfloor is thick enough or needs an overlay first.

My floors squeak. Will a new floor fix that?

Only if the squeak is dealt with during preparation, and this is the right moment. A squeak comes from subfloor panels moving against joists, so laying a new floor over it without refastening simply hides it for a few months.

Should I do the whole house at once?

It costs less per square foot in one go, because mobilisation and setup are shared, and the floors match across rooms. Against that, you have to live somewhere else or move around the house in stages. Both are workable and the quote shows the difference.

Price your York flooring job

One visit covers the measurement, the readings and the written quote.